Key Violations:
10|ADEQUATE HANDWASHING SINKS PROPERLY SUPPLIED AND ACCESSIBLE - Comments: HANDWASHING SINK IN PREP AREA UNABLE TO MAINTAIN PROPER TEMPERATURE (CURRENTLY 85F). INSTRUCTED THAT HOT WATER AT THE HANDWASH SINK BE 100F AT ALL TIMES. PRIORITY FOUNDATION 7-38-030(C).;;10|ADEQUATE HANDWASHING SINKS PROPERLY SUPPLIED AND ACCESSIBLE - Comments: OBSERVED NO HANDWASHNING SINK NEXT TO THE NEWLY ADDED CHANGING STATION IN PRE-K CLASSROOM 103. INSTRUCTD TO INSTALL HANDWASHK SINK WITH HOT/COLD RUNNING WATER UNDER CITY PRESSURE, AND ADEQUATE SUPPLIES OF SOAP AND PAPER TOWELS. PRIORITY FOUNDATION VIOLATION. 7-38-030(C);;10|ADEQUATE HANDWASHING SINKS PROPERLY SUPPLIED AND ACCESSIBLE - Comments: OBSERVED NO PAPER TOWELS IN ANY STUDENTS BOYS OR GIRLS RESTROOMS ON THE FIRST AND SECOND FLOOR. INSTRUCTED TO PROVIDE PAPER TOWLES AT ALL TIMES AT THE HAND SINK. PRIORITY FOUNDATION VIOLATION. 7-38-030(C).;;38|INSECTS, RODENTS, & ANIMALS NOT PRESENT - Comments: OBSERVED APPORX. 20 MICE DROPPINGS IN THE RIGHT CORNER OF PRE-K CLASSROOM 103 AND APPROX. 20 MICE DROPPINGS IN THE STORGE ROOM OF SAME CLASS, AS WELL AS APPROX. 150 MICE DROPPING THROUGHOUT THE SCHOOL (STORAGE AREAS NEXT TO PRINCIPAL OFFICE AND FRONT DOOR, BOYS AND GIRLS BATHROOM ON THE FIRST FLOOR, AND TEACHER'S LOUNGE. INSTRUCTED TO CALL PEST CONTROL, CLEAN, SANITIZE, AND MAINTAIN. PRIORITY FOUNDATION VIOLATION. 7-38-020(a);;5|PROCEDURES FOR RESPONDING TO VOMITING AND DIARRHEAL EVENTS - Comments: INCOMPLETE PROCEDURE/SUPPLIES FOR RESPONDING TO VOMITING AND DIARRHEAL EVENTS. INSTD TO PROVIDE COMPLETE PROCEDURE AND SUPPLIES NOTED. DISINFECTANT TO BE USED MUST BE EFFECTIVE AGAINST VIRUSES INCLUDING NOROVIRUS. PRIORITY FOUNDATION 7-38-010.;;53|TOILET FACILITIES: PROPERLY CONSTRUCTED, SUPPLIED, & CLEANED - Comments: OBSERVED NO TOILET TISSUE IN ANY OF THE BOYS AND GIRLS BATHROOM STALLS. INSTRUCTED TO PROVIDE TOILET TISSUE AT ALL TIMES IN THE BATHROOMS AND STALLS. PRIORITY FOUNDATION VIOLATION. 7-38-010;;55|PHYSICAL FACILITIES INSTALLED, MAINTAINED & CLEAN - Comments: OBSERVED BROKEN FLOOR TILE IN THE BOYS BATHROOM ON THE SECOND FLOOR. INSTRUCTD TO REPAIR AND MAINTAIN.;;55|PHYSICAL FACILITIES INSTALLED, MAINTAINED & CLEAN - Comments: OBSERVED LARGE HOLE IN THE BATHROOM AT THE BOTTOM OF WALL NEXT TO URINAL IN PRE-K CLASSROOM 102 WITH STEELWOOL BEING USED TO CLOSE THE HOLE, AS WELL AS STEELWOOL BEING USED TO FILL HOLES IN THE CEILING IN THE STORAGE AREA NEXT TO THE CAFETERIA. INSTRUCTED TO REPAIR AND MAINTAIN.;;55|PHYSICAL FACILITIES INSTALLED, MAINTAINED & CLEAN - Comments: OBSERVED LARGE OPENING IN THE CEILING OF THE BOY'S BATHROOM ON THE SECOND FLOOR. INSTRUCTED TO REPAIR AND MAINTAIN.;;55|PHYSICAL FACILITIES INSTALLED, MAINTAINED & CLEAN - Comments: OBSERVED PEELING PAINT ON THE CEILING ABOVE THE PREP STATION IN THE KITCHEN. INSTRUCTED TO REPAIR AND MAINTAIN.